Levy Rate (per $100)
Work levy (CU 36102) $0.13
Working Safer levy (flat, all CUs) $0.08
Combined ACC Work Account levy $0.21

Rates are GST-exclusive, for the 2026-27 levy year (1 April 2026 - 31 March 2027). Does not include the ACC earner's levy, CoverPlus Extra, or Experience Rating discounts/loadings.

Worked examples for CU 36102

Liable earnings Work levy Working Safer levy Total
$50,000 $65.00 $40.00 $105.00
$100,000 $130.00 $80.00 $210.00
$250,000 $203.63 $125.31 $328.95

Is $0.13 per $100 a high rate?

ACC sets a separate Work levy rate for each of its 536 classification units, priced on the injury risk and claims history of that activity rather than the size of the business. For 2026-27 those rates run from $0.02 to $5.29 per $100 of liable earnings, with a median of $0.67. CU 36102 sits in the cheapest quarter: 53 classification units are charged less and 478 are charged more.

Comparison Rate (per $100) Work levy on $100,000
CU 36102 — On-selling electricity and electricity market operation $0.13 $130.00
Median of all 536 CUs $0.67 $670.00
Median of the 13 Electricity, Gas, Water and Waste Services CUs $0.67 $670.00

On $100,000 of liable earnings that is $540.00 a year less Work levy than the median classification unit. CU 36102 is one of 5 classification units on this same rate .

What a different classification would cost

ACC assigns your CU from your declared business activity, so a business doing more than one thing can reasonably sit in more than one unit — and the choice is not cost-neutral. Within Electricity, Gas, Water and Waste Services the levy runs from $0.13 (CU 36102, On-selling electricity and electricity market operation) to $2.00 (CU 96380, Waste collection services (not elsewhere classified)) — $1,870.00 a year apart on $100,000 of liable earnings. These are the Electricity, Gas, Water and Waste Services units closest to CU 36102 on a different rate:

Classification unit Rate vs CU 36102 on $100,000
CU 36101 Electricity line-system operation $0.67 +$540.00 a year
CU 36200 Gas supply $0.67 +$540.00 a year
CU 37010 Water supply $0.67 +$540.00 a year
CU 37020 Sewerage and drainage services $0.67 +$540.00 a year
CU 96340 Waste treatment and disposal services $2.00 +$1,870.00 a year
CU 96350 Solid waste collection services $2.00 +$1,870.00 a year

Shown to help you sanity-check the CU on your ACC invoice against what your business actually does. You cannot choose your classification unit — ACC assigns it, and describing your activity inaccurately to get a lower rate is a false declaration.

Calculate your exact ACC Work levy

The figures above are worked examples. Use our calculator with CU 36102 pre-selected to see your exact levy for your own liable earnings.

Open ACC Work Levy Calculator →

Other classification units in Electricity, Gas, Water and Waste Services

Browse all Electricity, Gas, Water and Waste Services classification units →

Frequently Asked Questions

What is ACC Classification Unit 36102?

CU 36102 is "On-selling electricity and electricity market operation", one of ACC's 536 Classification Units in the Electricity, Gas, Water and Waste Services sector. ACC assigns businesses and self-employed people to this CU based on their declared business activity or BIC code.

What is the ACC Work levy rate for CU 36102?

For the 2026-27 levy year (1 April 2026 - 31 March 2027), CU 36102 has a Work Account levy rate of $0.13 per $100 of liable earnings, GST-exclusive. On top of that, every CU also pays the flat Working Safer levy of $0.08 per $100 — a combined rate of $0.21 per $100.

Is this the same as the ACC earner's levy?

No. The earner's levy is a single flat rate every employee and self-employed person pays for non-work injury cover — it's the same regardless of CU. The Work levy calculated here is an additional levy employers and self-employed people pay, and it varies by classification unit.

Is $0.13 per $100 a high ACC levy rate?

It sits in the cheapest quarter of ACC's 536 classification units: 53 charge less and 478 charge more. The median CU rate for 2026-27 is $0.67 per $100, and rates run from $0.02 to $5.29 — a spread that reflects injury risk and claims history by industry, not the size of the business.

What does being in the wrong CU cost?

Within Electricity, Gas, Water and Waste Services alone, rates run from $0.13 (CU 36102, On-selling electricity and electricity market operation) to $2.00 (CU 96380, Waste collection services (not elsewhere classified)). On $100,000 of liable earnings that is a difference of $1,870.00 a year in Work levy — which is why it is worth checking the CU on your ACC invoice actually matches what your business does.

How do I confirm my own CU?

ACC assigns your CU based on your declared business activity or BIC code — check a recent ACC invoice, or use ACC's CoverPlus Extra estimator for a business-specific confirmation. If your work doesn't match "On-selling electricity and electricity market operation", search our full CU list for a closer match.

Sources

Calculations assume the 2026-27 levy year, GST-exclusive rates, and no Experience Rating discount/loading or CoverPlus Extra. Confirm your own CU on a recent ACC invoice or via ACC's CoverPlus Extra estimator — this page is a reference estimate, not a substitute for your ACC assessment.

Related Calculators

Most searched navigate · open